news center
Production News Express
2025-01-13 views 127
On January 11th, the 50,000DWT MR tanker "CAPE AVANTI" built by our group’s New Yangzi Shipbuilding for Shipowner Evalend was delivered and departed from the shipyard wharf for operation. The vessel cut the first plate in mid-November, 2024 and was built in accordance with the rules and regulations of class LR, which is the second of six vessels in a series.
On January 8th, "CAPE AVANTI" was signed and delivered.
2025.05.29
Delivery of 50,000DWT MR tanker "JAL KAILASH" built by Yangz…
2025.05.19
Delivery and Departure of the Second 8200TEU LNG (Membrane T…
2025.05.14
Delivery and Departure of The Fifth 50,000DWT MR tanker "INI…
2025.05.07
Delivery and Departure of Group's First 8200TEU LNG (Membran…
2025.05.05
Delivery and Departure of the Sixth 16,000 TEU LNG Dual-fuel…
2025.04.10
Delivery and Departure of one 50,000DWT MR tanker "DINO" bui…
2025.04.10
Delivery and Departure of the Fifth 16,000 TEU LNG Dual-fuel…
2025.04.08
Successful Delivery of 66000DWT bulk carrier "UM JIANGSU" bu…
2025.03.29
Delivery of First 50,000DWT MR tanker "JAL PRERANA" built by…
2025.03.24
Delivery and Departure of 4600 TEU Container Vessel "Xin Qin…