news center
Production News Express
2025-01-11 views 156
On the morning of January 11th, the first 4600 TEU container vessel "Xin Yi Hai" built by our group’s New Yangzi Shipbuilding for Trawind Shipping was delivered and departed from the shipyard wharf for operation.The vessel is an energy-saving and environment-friendly container vessel with excellent portability and strong market competitiveness. After being put into operation, it will help the shipowner to further optimize the fleet structure, provide customers with better transportation services, and enhance the company's operation and management capability and market competitiveness.
"Xin Yi Hai" measures 228m in length overall,224.52m in length between perpendiculars,40m in moulded width,19.6m in moulded depth and a design draft of 13.75m.The vessel cut the first plate at the end of January,2024 and was built in accordance with the rules and regulations of class CCS.
On January 8th, Mr. Liu Xinghua, General Manager of Trawind Shipping & Logistics, and Mr. Du Chengzhong, Deputy General Manager of the Group and General Manager of New Yangzi Shipbuilding, signed the delivery protocols on behalf of the ship owner and the shipyard respectively.
2025.05.29
Delivery of 50,000DWT MR tanker "JAL KAILASH" built by Yangz…
2025.05.19
Delivery and Departure of the Second 8200TEU LNG (Membrane T…
2025.05.14
Delivery and Departure of The Fifth 50,000DWT MR tanker "INI…
2025.05.07
Delivery and Departure of Group's First 8200TEU LNG (Membran…
2025.05.05
Delivery and Departure of the Sixth 16,000 TEU LNG Dual-fuel…
2025.04.10
Delivery and Departure of one 50,000DWT MR tanker "DINO" bui…
2025.04.10
Delivery and Departure of the Fifth 16,000 TEU LNG Dual-fuel…
2025.04.08
Successful Delivery of 66000DWT bulk carrier "UM JIANGSU" bu…
2025.03.29
Delivery of First 50,000DWT MR tanker "JAL PRERANA" built by…
2025.03.24
Delivery and Departure of 4600 TEU Container Vessel "Xin Qin…