黄网网站精品一区二区三区|很很干天天拍中文字幕资源站|www无码精品91激情制服丝袜|国产午夜精品一区二区武松

News

news center

Production News Express

Delivery and Departure of 4600 TEU Container Vessel "Xin Yi Hai"

2025-01-11 views 156

On the morning of January 11th, the first 4600 TEU container vessel "Xin Yi Hai" built by our group’s New Yangzi Shipbuilding for Trawind Shipping was delivered and departed from the shipyard wharf for operation.

 

"Xin Yi Hai" measures 228m in length overall,224.52m in length between perpendiculars, 40m in moulded width, 19.6m in moulded depth and a design draft of 13.75m. The vessel cut the first plate at the end of January, 2024 and was built in accordance with the rules and regulations of class CCS.

 

On January 8th, Mr. Liu Xinghua, General Manager of Trawind Shipping & Logistics, and Mr. Du Chengzhong, Deputy General Manager of the Group and General Manager of New Yangzi Shipbuilding, signed the delivery protocols on behalf of the ship owner and the shipyard respectively.

The vessel is an energy-saving and environment-friendly container vessel with excellent portability and strong market competitiveness. After being put into operation, it will help the shipowner to further optimize the fleet structure, provide customers with better transportation services, and enhance the company's operation and management capability and market competitiveness.